please select HUIYUE transformer bushing auto through machine manufacturer.

Group official website|Sitemap|Contact
Transformer Bushing  Auto through machine
慧越自动穿套管机厂家
+MOREProduct/Catgories
+MOREInformation
Contact

 HUIYUE Technology

 TEL :0086-0769-89870552

 FAX :0086-0769-86475353

 Q Q :892653635  2961708569

 Skype: 892653635@qq.com

 Zip code: 523900

 Email:dg@cnhuiyue.com

 WebSite:http://www.cnhuiyue.com/en/

Tunnel drying furnace Handling Precautions

Editor:transformer bushing auto through machine,  Date:2015-10-16  Views:
Tunnel drying furnace is mainly applied to PCB circuit boards, high-frequency transformers, electronic components and other electronic products, baking, temperature, heat treatment and other processes, then tunnel drying furnace often long-term production use, the need to pay attention to what in operation matter, the technician Yang Hui today as we explain, please read below:
 

Tunnel drying oven features:

1, the amount of wind hot air inside the loop, high thermal efficiency, energy saving.
2, the use of forced ventilation box with adjustable air board, uniform drying, heat source can be steam, hot water, electricity, far infrared, a wide choice.
3. The machine has low noise, running balance.
4, temperature-controlled, easy installation and maintenance.
5, wide application and can be used for drying various materials.

Tunnel drying oven Instructions:

1. Please read the instructions carefully before using the product.
2. prohibited the power cords, plugs and electrical tunnel furnace immersed in water or other liquids to prevent electric shock.
3. The tunnel furnace is in operation, the surface temperature may be high, do not touch.
4. Place the tunnel furnace on a dry, flat places, and leave enough space around, keeping a distance of at least 10-15cm surrounding objects.
5. Do not use non-manufacturers to provide accessories.
6. Non pull the power cord, in a mobile tunnel furnace must first disconnect the power.
7. Never use the tunnel furnace is placed in the vicinity of combustible or heat source.
8. If the power cord or plug is damaged, please stop using and timely maintenance.
9. When using the product, if the circuit is overloaded, it may lead to a tunnel furnace is not working properly. Tunnel furnace should use a separate line.
10. Do not use an airtight container placed in an oven heated, otherwise there is danger of explosion.
11. When the tunnel furnace in working condition, in order to avoid burns, use only the knob or handle.
12. Different types of products, the absorbed heat and temperature at different speeds, have a good product when using baking temperature, time and most importantly, close the door there is the phenomenon of heat, be careful burns, wear high temperature gloves to prevent touching the heating element burns fingers.
13. Not when the heating switch, air transport switch, the power switch three position switch to shut down, keeping the inner cavity wall clean, bakery products completed, if the oven cavity grease and other filth, available industrial alcohol graze tunnel furnace within the cavity wall of the clean up, and moisture is discharged from the door, the tunnel furnace surface with a soft cloth to wipe, can not flush lumen with water to prevent electrical connection, but can not wipe with water that day.
14. Tunnel furnace installed a three-phase five-wire power cord, use alternating current, voltage and frequency marked on the device nameplate. Ground wire is yellow / green color line.
Fifteen. Wire and power connection: Depending on the nameplate load, install a standard switch. When connecting the power cord must be installed with a minimum contact gap of a multi-pole breaker 3mm in the vicinity of the device, and in line with current regulations.
16. Only in the tunnel furnace used properly, under effective grounding and comply with electrical safety regulations, the device's electrical safety can be guaranteed. It must ensure the effective grounding, if you have any doubts, you can notify qualified technical personnel. The manufacturer does not assume any responsibility for the consequences resulting from damage to the device caused no grounding system.
17. Before the device is powered, check the power distribution cabinet system meets the pointing device nameplate to check whether the electrical power supply systems and electrical cabinet socket supports load indicated on the device nameplate maximum power. If in doubt, notify a qualified technician check.

18. If the plug and receptacle do not match, you should ask a qualified technician to replace the proper outlet. Especially the latter, you must ensure that the line for the device power socket, multi-outlet and an extension cord.

 

不锈钢条形隧道炉

HY-K02红外线隧道炉图片

不锈钢视频隧道炉

不锈钢视频隧道炉

不锈钢红外线隧道炉

不锈钢红外线隧道炉

不锈钢网带隧道炉(加密)

不锈钢网带隧道炉

慧越IR烘干线隧道炉

IR烘干线隧道炉

双线红外线隧道炉

双线红外线隧道炉

十米变压器隧道炉

十米变压器隧道炉

小型红外线隧道炉

小型红外线隧道炉

小型变压器隧道炉

小型变压器隧道炉

小型红外线隧道炉控制器

小型红外线隧道炉控制器

不锈钢方通隧道炉

不锈钢方通隧道炉

慧越红外线隧道炉现场图片

HY-K02红外线隧道炉

慧越隧道炉烘烤图

红外线隧道炉厂家

慧越隧道炉工作图

慧越隧道炉工作图

慧越隧道炉工作图1

慧越隧道炉工作图1

慧越隧道炉工作图2

慧越隧道炉工作图

慧越隧道炉工作图3

慧越隧道炉工作图3

慧隧道炉越控制面板

慧隧道炉越控制面板

慧越隧道炉定时器

慧越隧道炉定时器

隧道炉变频器调试

隧道炉变频器调试

慧越隧道炉电箱保护

慧越隧道炉电箱保护

东莞隧道炉厂房


Source:HUITUE transformer bushing auto through machine Manufacturers
Share:
Correlation
Correlation News
Copyright © 2008-2016 HUIYUE transformer bushing auto through machine manufacturer
Service E-mail:dg@cnhuiyue.com     Skype:892653635@qq.com    Group official website:自动穿套管机
transformer bushing auto through machine,casing pipe machine,cnc winding casing pipe machine,please select HUIYUE transformer bushing auto through machine manufacturer
Address: dongguan humen town Wilder saemaul undong new seven alleys number five  Zip code: 523926
open